
Pepsico Gatorade Energydrinks
PepsiCo operates a large facility for producing Gatorade energy drinks in Tolleson in the Phoenix Metropolitan Area in Arizona, USA.
The project started when the SOLID CEO met CGD’ facility manager at a conference and expressed his desire for a green solution as CGD had high cooling, heating and hot water demand.
Together with Energia de Portugal, charged by CGD, SOLID develop a solution for cooling, space heating and hot water with collectors only in the inside of the building complex. The architect refused, that collectors are placed on the visible outside part of the building complex. Even though the building was already existing, the architect has a life-long veto right regarding major changes of the building.
The solar system has a good marketing effect for the bank and boosts its green image. There is even a demo collector in the lobby of the building.
Click on the button and we will be happy to help you!

PepsiCo operates a large facility for producing Gatorade energy drinks in Tolleson in the Phoenix Metropolitan Area in Arizona, USA.

Fleischwaren Berger, located in Sieghartskirchen near Vienna, exists since over 125 years and produces different types of ham. The company is family-owned and family-run has

In order to get one step closer to becoming the solar capital of Europe, the City of Graz and the urban energy utility company Energy
Green news: Latest trends in the spotlight